এপিএসসিএল-এর মাস্টার প্ল্যান

Generation Plan of APSCL Up to 2041
           
Year Installed Capacity (MW) New Addition (MW) Retirement Plan (MW) Additional Increase (MW) Total Generation (MW)
1 2 3 4 5=3-4 6=2+5
2021-2025 1540 400+400+100=900 150+150=300 600 2140
Ashuganj 400 MW CCPP (East), Ashuganj 400 MW CCPP (Replacement Project), 100 MW Grid Tied Solar Power Plant (Phase-1) Ashuganj Unit-4, Ashuganj Unit-5
2026-2030 2140 600+100+1200=1900 53+195=248 1652 3792
Ashuganj 600 MW CCPP (Replacement Project), 100 MW Grid Tied Solar Power Plant, Patuakhali 1200 MW CCPP (Phase-1) Ashuganj 50 MW GEPP, United Ashuganj 200 MW Modular Power Plant
2031-2041 3792 600+600+1200=2400 223+383=606 1794 5586
Ashuganj 600 MW CCPP (Phase-1) at B-type Area, Ashuganj 600 MW CCPP (Phase-2) at B-type Area, Patuakhali 1200 MW CCPP (Phase-2) Ashuganj 225 MW CCPP, Ashuganj 450 MW CCPP South